The Chatham-Siler City Advanced Manufacturing site has high quality transportation and utility infrastructure that helps drive business. The network strengthens our business community and makes it easy to stay connected.
Water
Lines to the site are currently under construction.
Wastewater
Lines to the site are currently under construction.
natural gas
Size: 6”
Timeline: 18 months
Provider: Dominion Energy
ELECTRIC
Network: 230 KV single circuit on site
Provider: Duke Energy or Randolph Electric
Fiber Optic
Timeline: 90 days
Provider: CenturyLink
ROADS
Direct access to Highway 64
Planning and preliminary design in progress for a proposed interchange on US 421, with connector road to provide secondary truck access from the four-lane divided highway to the site
RAIL
Easy on-site access Norfolk Southern rail line
AIR
2 international airports within 50 miles