The Chatham-Siler City Advanced Manufacturing site has high quality transportation and utility infrastructure that helps drive business. The network strengthens our business community and makes it easy to stay connected.

 Water

Lines to the site are currently under construction.

 Wastewater

Lines to the site are currently under construction.

natural gas

Size: 6”
Timeline: 18 months
Provider: Dominion Energy

ELECTRIC

Network: 230 KV single circuit on site
Provider: Duke Energy or Randolph Electric

 

Fiber Optic

Timeline: 90 days
Provider: CenturyLink

 ROADS

Direct access to Highway 64   
Planning and preliminary design in progress for a proposed interchange on US 421, with connector road to provide secondary truck access from the four-lane divided highway to the site

RAIL

Easy on-site access Norfolk Southern rail line

AIR

2 international airports within 50 miles

 